Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Veículo Elétrico Ligeiro Mercadorias Transformação

Total project amount

25 thousand €

Amount paid

17,5 thousand €

Non-refundable funding

25 thousand €

Loan funding

0 €

Start date

29.05.2024

Expected end date

28.05.2025

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

08/C03-i01/2023.PPRR-RE-C03-i01-08-000136

Summary

A instituição necessita de renovar a sua frota e consequentemente irá optar por uma viatura eléctrica, dadas as vantagens sobre as viaturas a combustão.A viatura eléctrica irá melhorar o nível das respostas sociais de proximidade contribuindo para optimizar os apoios e serviços que a instituição presta sem que os utentes tenham que sair dos seus contextos naturais de vida. O número de utentes abrangidos será o actual.A viatura estará munida de caixa de carga adaptada ao transporte de refeições e de outros produtos simultaneamente (produtos de limpeza, higiene, etc.). Isto irá permitir melhorar o nível de serviço uma vez que as refeições irão manter um nível de temperatura controlada, sem afectação de outros produtos que nela sejam transportados.Em paralelo a instituição irá beneficiar o ambiente tendo em conta que a nova viatura:- não emitirá gases, sendo amiga do ambiente. A preocupação com as emissões CO2 tem vindo a aumentar, até porque a circulação de viaturas a combustão em alguns centros de cidades, já começa a ser restrita.- o custo de manutenção será mais baixo do que o actual, pois tanto os travões como os filtros, correias, ou outras peças, não se desgastam com tanta facilidade como num carro tradicional. Por outro lado o futuro carro eléctrico poderá fazer mais quilómetros no intervalo de revisões, comparando com os veículos movidos a combustíveis fósseis.- não pagará parquímetro em várias cidades.- terá um incentivo fiscal, e também fica isento de pagar o Imposto Sobre Veículo (ISV) e o Imposto Único de Circulação (IUC).- não utilizará combustíveis, o que será um benefício dado o incremento de preços dos mesmos.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

25 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Mealhada 25 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading