Name

Veículo Elétrico Ligeiro Mercadorias Transformação

Total project amount

25 thousand €

Amount paid

17,5 thousand €

Non-refundable funding

25 thousand €

Loan funding

0 €

Start date

26.06.2024

Expected end date

23.06.2025

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

08/C03-i01/2023.PPRR-RE-C03-i01-08-000113

Summary

O Centro Paroquial e Social de Lanheses (CPSL) é uma IPSS que, entre outras repostas socias, dinamiza quotidianamente um Serviço de Apoio Domiciliário (SAD). O SAD do CPSL possui uma capacidade instalada prevista para 73 utentes e tem vindo a sentir um aumento superlativo da procura por parte de populações limítrofes e não limítrofes a Lanheses, nomeadamente, Montaria, Amonde, Nogueira, Vilar de Murteda, Orbacém, Dem e Gondar. Adicionalmente registe-se que o CPSL se encontra, neste momento, a preparar uma candidatura, em sede de PROCOOP, no sentido de poder alargar o atual Acordo de Cooperação em vigor, que atualmente é de 14 utentes sendo que a frequência se encontra perto dos 40 utentes.Existe, também, neste momento em desenvolvimento um projeto conjunto com a Camara Municipal de Viana do Castelo no sentido de alcançar, em efetivo esforço e com maior proximidade, a cobertura das populações acima descritas, que, infelizmente, se encontram atualmente a descoberto de qualquer equipamento ou resposta social.Assim, comungando com os objetivos associados à pegada carbónica, no sentido de se melhor se poder capacitar e dar qualitativa resposta a novas solicitações no âmbito do SAD, o CPSL necessita, de facto, aumentar a sua de frota. Assim a oportunidade gerada pela operação Mobilidade Verde - Aquisição de Viaturas Elétricas para SAD representa uma grande oportunidade e, crendo na sua boa resolução, uma grande mais-valia.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

25 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Viana do Castelo 25 thousand € ,
Source EMRP