Project sheet

Name

Renovação Freguesia S. Miguel do MAto

Total project amount

12,97 thousand €

Amount paid

3,89 thousand €

Non-refundable funding

12,97 thousand €

Loan funding

0 €

Start date

02.09.2024

Expected end date

31.03.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

06/C03-i02/2024.P11585

Summary

A presente operação caracteriza-se por o desenvolvimento de duas ações:Ação 1Criação de uma casa de banho adaptada que têm como objetivo principal garantir que as pessoas tenham acesso facilitado a espaços sanitários adequados às suas necessidades. Isso permite que elas possam utilizar os sanitários de forma independente e com maior conforto, contribuindo para a sua inclusão social. Com essas adaptações, as pessoas com mobilidade reduzida podem utilizar os sanitários com maior segurança, sem depender de auxílio de terceiros, o que contribui para a sua independência e autoestima.Este WC terá acesso direto pelo exterior do edifício visto que face à arquitetura do edifício conta com degraus no seu interior que impedem o seu acesso. Será aberta desta forma uma entrada direta ao mesmo.Será colocada uma rampa de acesso ao WC de forma a eliminar as barreiras físicas à circulação de uma cadeira de rodas e o correto acesso ao espaço.Ação 2Colocação de rampa de acesso ao edifício no local onde se vai desenvolver atendimento no conceito espaço cidadão, ponto de atendimento itinerante que disponibiliza mais de 200 serviços públicos de forma a eliminar a barreira arquitetónica de um degrau entre a cota do passeio e o piso interior, com inclinação regulamentar, de forma a permitir o acesso a pessoas com mobilidade condicionada e implementação de dois balcões de atendimento.Neste espaço vão ser criados dois balcões de atendimento para o desenvolvimento dos serviços a prestar à população, os quais também eles estão previstos na candidatura.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

12,97 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Vouzela 12,97 thousand € ,
Source EMRP