Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Boim + Acessível

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.11.2024

Expected end date

31.12.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

06/C03-i02/2024.P11308

Summary

O acesso ao edifício desde a via pública é feito pelo portão de entrada, que dá acesso a uma rampa (a contruir) e esta por sua vez dá acesso à porta de entrada principal do edifício. Esta rampa ajuda a vencer a diferença de cotas de cerca de 70cm que existe entre a via pública e a cota de soleira. No espaço exterior que antecede a entrada no edifício e imediatamente após a entrada, no hall, é possível inscrever uma manobra de rotação de 360ª. É ainda proposta a alteração das instalações sanitárias existentes, visto não existir no edifício nenhuma adaptada a pessoas com mobilidade reduzida. Uma vez que o espaço o permite propomos a requalificação das duas casas de banho existente, permitindo assim a separação por sexos. O restante percurso acessível é todo facilitado e de nível. São asseguradas as dimensões mínimas para o percurso acessível: receção, atendimento e instalação sanitária. Não obstante, serão retificadas as dimensões das portas existentes, de forma a que todos os compartimentos permitam o acesso a pessoas com mobilidade reduzida. De salientar ainda que durante a fase de execução dos trabalhos mencionados será necessária a reestruturação da rede de águas e esgotos, visto que será alterada a localização das loiças sanitárias. Face ao exposto, consideram-se cumpridas todas as disposições técnicas aplicáveis.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Lousada 13 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading