PRR Project
Canidelo + Acessível
Project sheet
Name
Canidelo + AcessívelTotal project amount
13 thousand €Amount paid
3,9 thousand €Non-refundable funding
13 thousand €Loan funding
0 €Start date
01.06.2024Expected end date
31.08.2024Dimension
ResilienceComponent
Social InterventionInvestment
360° AccessibilityOperation code
06/C03-i02/2024.P11300Summary
Numa primeira fase foi demolido o muro de exterior existente, confrontante com a via pública e alargado o espaço de passeio/circulação exterior. Esta intervenção permite tornar o percurso exterior acessível, onde anteriormente apenas existia um passeio com 70cm de largura. Será também nivelado o piso neste espaço que antecede a rampa e as escadas, de forma a que o percurso seja feito de nível. O acesso ao edifício é feito através de uma rampa existente, que será alterada, de forma a cumprir com o regulamento técnico de acessibilidades. Será reduzido o declive da rampa e aumentado o lance de forma a garantir uma inclinação de 8%. Será ainda colocado novo corrimão. A rampa dá acesso à porta de entrada principal do edifício e ajuda a vencer a diferença de cotas de cerca de 55cm que existe entre a via pública e a cota de soleira. No espaço exterior que antecede a entrada no edifício e imediatamente após a entrada, no hall, é possível inscrever uma manobra de rotação de 360ª. É ainda proposta a alteração das instalações sanitárias existentes, uma vez que não existe no edifício nenhuma adaptada a pessoas com mobilidade reduzida. O restante percurso acessível é todo facilitado e de nível. São asseguradas as dimensões mínimas para o percurso acessível: receção, atendimento e instalação sanitária. Não obstante, todos os compartimentos permitem o acesso a pessoas com mobilidade condicionada. De salientar ainda que durante a fase de execução dos trabalhos mencionados será necessária a reestruturação da rede de águas e esgotos, visto que será alterada a localização das loiças sanitárias.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
13 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 30 %,Where was the money spent
By county
1 county financed .
-
Vila do Conde 13 thousand € ,