Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

"Perafita + Acessível"

Total project amount

11,36 thousand €

Amount paid

3,41 thousand €

Non-refundable funding

11,36 thousand €

Loan funding

0 €

Start date

02.09.2024

Expected end date

31.10.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P8077

Summary

A intervenção em causa é num edifício anexo, dentro do cemitério de Perafita, que serve como arrumos e instalação sanitária de acesso público. O acesso é feito desde a via pública através da entrada principal do cemitério e todo o percurso até ao referido anexo é facilitado e de nível.A proposta prevê a adaptação deste espaço de forma a torná-lo acessível a pessoas com mobilidade reduzida, nomeadamente o acesso às instalações sanitárias e aos arrumos/vestiários.É proposta a demolição das paredes da instalação sanitária existente e a ampliação do edifício, prevendo a colmatação deste com a fachada lateral da igreja. Será assim criada uma instalação sanitária para acessibilidades que servirá também para um dos sexos, e também será mantida uma segunda instalação sanitária, para que desta forma não sejam prejudicadas as atuais condições existentes.No compartimento de arrumos, que serve também de vestiário é proposta a melhoria das atuais condições, através da substituição da base de duche por outra com medidas regulamentares e colocação dos respetivos acessórios, nomeadamente barras de apoio e banco rebatível.Serão também corrigidas as dimensões das portas de forma a que sejam cumpridas as dimensões exigidas no regulamento para acessibilidade e mobilidade (DL 163/2006).O restante percurso acessível é todo facilitado e de nível. São asseguradas as dimensões mínimas para o percurso acessível desde a via pública.Face ao exposto, consideram-se cumpridas todas as disposições técnicas aplicáveis.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

65,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

11,36 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Matosinhos 11,36 thousand € ,
Source EMRP