Project sheet

Name

Brufe + Acessível

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

20.06.2025

Expected end date

02.09.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P5885

Summary

O acesso ao edifício desde a via pública é feito pelo portão de entrada e atravessando o logradouro, através de uma rampa que dá acesso à porta de entrada principal.É proposta a colocação de uma porta de vidro automática, que funcionará como uma antecâmara e permite assim que a porta de entrada existente se possa manter permanentemente aberta e assim as pessoas com mobilidade reduzida tenham um acesso ao interior do edifício mais facilitado, uma vez que a abertura da porta de vidro é automática, ativada por sensores de movimento.Propõe-se ainda a substituição da porta de acesso à zona de atendimento, que é de abrir, por uma porta de correr em vidro automática. Este espaço não está equipado com mobiliário adaptado a pessoas com mobilidade reduzida e desta forma é proposta a criação de um balcão de atendimento, em “L”, com uma zona de receção e quatro zonas de atendimento, todas elas adaptadas para pessoas com mobilidade reduzida. O acesso reservado para funcionários é feito por uma porta de vidro de abrir.O restante percurso acessível é todo facilitado e de nível. São asseguradas as dimensões mínimas para o percurso acessível: recepção, atendimento e instalação sanitária. Não obstante, todos os compartimentos permitem o acesso a pessoas com mobilidade condicionada.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Vila Nova de Famalicão 13 thousand € ,
Source EMRP