Project sheet

Name

Adaptação do edifício do Espaço de Cidadão/CTT de Vilamar a pessoas de mobilidade condicionada

Total project amount

7,15 thousand €

Amount paid

2,14 thousand €

Non-refundable funding

7,15 thousand €

Loan funding

0 €

Start date

01.04.2025

Expected end date

31.08.2026

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4711

Summary

Programa FuncionalEste projeto de beneficiação do edifício onde funcionam o Posto dos CTT e Espaço de Cidadão de Vilamar implica unicamente intervenções interiores, que passam por:•Projetar uma instalação sanitária acessível a todos na zona posterior da construção onde existe já uma, cumprindo o disposto no DL 163/2006, tanto ao nível de dimensão como dos equipamentos necessários, como um lavatório com torneira apropriada, uma sanita com barras de apoio amovível. A porta de entrada terá a abertura para o exterior, com largura útil de 0,90 x 2,00m de altura. Prevê-se um sistema de alarme, em caso de emergência;•Projetar um balcão de atendimento acessível a todos com uma pequena alteração no desenho atual, ficando com altura regulamentar conforme o disposto no DL 163/2006;•Substituir algumas portas interiores para alargar e dar cumprimento ao mesmo DL;•Ao nível exterior não é necessária nenhuma intervenção porque já existe uma rampa que cumpre a legislação.Ao nível dos Acabamentos:•A este nível prevê-se nas zonas húmidas cerâmicos tanto nas paredes como pavimentos;•As portas a alargar manterão a lógica existente;Com este projeto de arquitetura de adaptação do edifício a pessoas de mobilidade condicionada, pretende a Junta de Freguesia prestar um serviço de atendimento digno à comunidade.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

85,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

7,15 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Cantanhede 7,15 thousand € ,
Source EMRP