Name

Rampa de acesso ao edifício sede da União das Freguesias de Carvoeira e Carmões

Total project amount

12,98 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

12,98 thousand €

Loan funding

0 €

Start date

01.11.2024

Expected end date

31.12.2024

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4705

Summary

Para quem tenha mobilidade condicionada as dificuldades iniciam-se logo com uma escada entre o estacionamento que serve este serviço e a porta de entrada do próprio edifício; o balcão de atendimento, apesar de já ter uma rampa que cobre os degraus que o antecedem, não é propriamente funcional a quem tenha mobilidade reduzida; além disso, o acesso ao auditório no andar de cima também só é possível através de umas escadas. Notou-se, portanto, uma urgência em modificar os acessos ao edifício de modo a torná-lo acessível, funcional, inclusivo e interativo a todos os cidadãos.Desta forma, pretende-se alterar a frente/entrada do edifício para o lado do largo da igreja, onde consta o estacionamento e o centro de saúde, de modo a melhorar a acessibilidade, mas também a centralidade do serviço. O largo principal da localidade de Carvoeira ficará assim com uma funcionalidade orgânica mais prática e dinâmica e a própria Junta de Freguesia terá o acesso mais apelativo, o que contribuirá adicionalmente para a melhoria da proximidade aos cidadãos.Em vez dos vários pisos que repartem os espaços deste serviço, o atendimento será realizado num espaço amplo e personalizado que incluirá o balcão de atendimento da Junta de Freguesia, o balcão dos CTT e o Espaço Cidadão, assim como outros serviços que a Junta possa vir a integrar de atendimento direto. Ao lado, a sala do Executivo e a sala de Assembleia de Freguesia ficarão no mesmo piso, assim como as instalações sanitárias adaptadas, para que a acessibilidade e a funcionalidade sejam imediatas.Esta candidatura aplica-se à construção de uma rampa de acesso direto ao rés-do-chão, piso onde serão disponibilizados todos estes serviços. A rampa fará a ligação entre o largo onde está o estacionamento e a entrada do edifício, facilitando a deslocação e melhorando a acessibilidade de todo o edifício. O investimento na construção da rampa será de 12 985€. No próximo ano prevê-se a disponibilização do orçamento para a conclusão das obras na totalidade do edifício.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

65,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

12,98 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Torres Vedras 12,98 thousand € ,
Source EMRP