Information portal on various topics of management of public resources of the Portuguese State

PRR Project

Reablitação da sala do pré-escolar, das instalações sanitárias. da cozinha, do refeitório e respetivos acessos

Project sheet

Name

Reablitação da sala do pré-escolar, das instalações sanitárias. da cozinha, do refeitório e respetivos acessos

Total project amount

13 thousand €

Amount paid

13 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.05.2023

Expected end date

29.10.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4589

Summary

A acções e investimentos do projecto são as seguintes1 - Sala de actividades Pré - escolar- Colocação de uma porta nova na Sala de Actividades para melhorar as condições de acesso, ventilação e renovação do ar, assim como a iluminação da mesma.- Execução de divisória, com porta, para evitaro acesso de criaças à zona das escadas.- Ececução de bancada com cuba em inox com acesso a àgua e esgoto.- Colocação de pavimento linóleo/vinilico na sala de aactividades com caracteristicas antiderrapantes, e caracterísiticas sonoras adquadas.2 - Instalações sanitárias para crianças:- Adquação dos equipamentos sanitários à idade dos utiulizadores- Execução de duche e tubagem de água quente- Colocação de pavimento adquado à instalações sanitárias3 - Instalações sanitárias para adultos- Execução de uma divisória no corredor que dá acesso às instalações sanitárias, para existir uma separação física com as instalações sanitárias das crianças4 -Cozinha- Colocação de armários inferiores em inox - de acordo com as exigências legais- Execução de divisória entre a cozinha e o refeitório de forma a existir separação fisica entre os espaços, no sentido de que o acesso ao o espaço seja seguro na sua utilização- Eliminação de instações electricas executadas pelo exterior da parede5- Refeitorio- Demolição de parede na zona do refeitório para facilitar o acesso e aumentra a área util do refeitório.- Abertura de uma janela para melhorar as condições de acesso ao exterior em caso de emergência, ventilação e iluminação natural dos dois espaços. Tem ainda o objetivo de melhorar o campo visual das crianças.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Estremoz 13 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading