Information portal on various topics of management of public resources of the Portuguese State

PRR Project

Substituição de frota poluente por veículo 100% elétrico para operação turística sustentável

Project sheet

Name

Substituição de frota poluente por veículo 100% elétrico para operação turística sustentável

Total project amount

20 thousand €

Amount paid

20 thousand €

Non-refundable funding

20 thousand €

Loan funding

0 €

Start date

07.03.2025

Expected end date

04.08.2026

Dimension

Climate Transition

Component

REPowerEU

Investment

Decarbonization of transport

Operation code

03/C21-i13-RAM/2024.P18136

Summary

A RMK Tours – Agência de Viagens e Turismo Lda., sediada na Calheta, Madeira, apresenta esta candidatura com o objetivo de substituir uma viatura em fim de vida, utilizada nas suas operações turísticas, por um veículo 100% elétrico. A empresa atua no setor do turismo desde 1999, sendo reconhecida pelos seus serviços personalizados em trilhos, transferes e animação turística.Com esta operação, a empresa visa reduzir a sua pegada ambiental, reforçar o compromisso com a sustentabilidade, e continuar a prestar serviços de transporte turístico com maior eficiência energética e menor impacto ambiental. Esta substituição irá contribuir diretamente para a estratégia de descarbonização regional e reforçar a frota atual de viaturas elétricas, melhorando simultaneamente a imagem da empresa perante os visitantes e a comunidade local.O projeto insere-se no âmbito da tipologia "Abate de veículo em fim de vida / Aquisição de veículo 100% elétrico novo", conforme previsto na Submedida C21-i13-RAM-m03 do Programa de Recuperação e Resiliência - Madeira. A RMK Tours possui registo válido enquanto agência de viagens e operador de animação turística, estando devidamente licenciada para operar na Região Autónoma da Madeira.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

0,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

20 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Calheta 20 thousand € ,
Source EMRP
07.08.2026
All themes