Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Ampliação de UPAC com armazenamento de energia JOSSOIS

Total project amount

68,27 thousand €

Amount paid

67,75 thousand €

Non-refundable funding

68,27 thousand €

Loan funding

0 €

Start date

01.05.2023

Expected end date

31.05.2024

Dimension

Climate Transition

Component

REPowerEU

Investment

Reinforced measure: Decarbonization of industry

Operation code

03/C21-i01/2022.P5053

Summary

Ampliação de uma unidade de produção para autoconsumo (UPAC) já existente, com o objetivo de adequar os consumos energéticos aos requisitos económicos da atividade.Com esse propósito serão associados e instalados mais 128 módulos de painéis fotovoltaicos de 455 W, conduzindo a um aumento para o triplo da capacidade instalada (de 23,4 kWp para 81,64 kWp).Complementarmente será instalado um conjunto de 12 baterias de 5 kW/cada, associadas em 4 módulos de 3 baterias, para permitir a adequada acumulação/armazenamento de energia. O sistema global estará ajustado ao consumo elétrico de referência, e prevê a produção de 106452 kWh/ano de energia elétrica, sendo que 78660 kWh serão objeto de autoconsumo, conferindo à instalação uma autonomia de energia elétrica da ordem dos 88,3 %, com uma redução total de GEEs de 88,3 %

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

68,27 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 99,2 %,

Where was the money spent

By county

1 county financed .

  • Vila Verde 68,27 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading