Project sheet

Name

Mob - Solar Energy

Total project amount

155,15 thousand €

Amount paid

155,15 thousand €

Non-refundable funding

155,15 thousand €

Loan funding

0 €

Start date

01.03.2023

Expected end date

31.12.2024

Dimension

Climate Transition

Component

REPowerEU

Investment

Reinforced measure: Decarbonization of industry

Operation code

03/C21-i01/2022.P4670

Summary

O projeto que a promotora MOB apresenta assenta na instalação de um sistema fotovoltaico na cobertura da fábrica em estrutura complanar com 501,6 kWp de Potência Instalada e 440 kWn de Potência de ligação, composto por 912 módulos monocristalinos de 550 Wp da Suntech (ou equivalente Tier Bloomberg List) e 4 Inversores Sungrow ? SG110CX com potência nominal de saída de 110 Kwn cada Inversor. Esta UPAC foi dimensionada tendo por base: os limites previstos no presente Aviso, a disponibilidade de m2 de área para colocação dos painéis fotovoltaicos com exposição solar favorável e o consumo efetivo de energia elétrica da unidade fabril aqui em análise, já que o projecto assegurará 50,5% das necessidades energéticas da instalação fabril da MOB cita em Viseu.Este sistema irá evitar a emissão de aproximadamente 73,32 Ton CO2 por ano, prevendo-se um autoconsumo correspondente a 398.473 Kwh/ano.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

155,15 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Viseu 155,15 thousand € ,
Source EMRP
24.11.2026