Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Clean Energy 2 - Nave 5 - 2023-2024

Total project amount

50,05 thousand €

Amount paid

50,05 thousand €

Non-refundable funding

50,05 thousand €

Loan funding

0 €

Start date

06.03.2024

Expected end date

30.09.2024

Dimension

Climate Transition

Component

REPowerEU

Investment

Reinforced measure: Decarbonization of industry

Operation code

03/C21-i01/2022.P4598

Summary

A Gosimat tem a intenção de dotar a Nave 5 com um sistema de produção local de energia elétrica para autoconsumo com fonte de energia renovável (solar), intervenção esta que respeita as tipologias previstas no referido Aviso e que visa a prossecução dos objetivos previstos no Regulamento (EU) 2021/241. Nomeadamente, a intervenção proposta irá introduzir sistemas e tecnologias que possibilitam uma redução significativa dos consumos, em particular energéticos de origem fóssil e contribuir para a redução das emissões de gases com efeito de estufa. A medida de intervenção aplicada neste edifício permite melhorar o desempenho energético garantindo uma redução de cerca de aproximadamente 51,62% no consumo de energia primária (tep/ano) de origem fóssil.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

50,05 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Leiria 50,05 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading