Project sheet

Name

Implementação de Sistema Fotovoltaico

Total project amount

42,47 thousand €

Amount paid

42,47 thousand €

Non-refundable funding

42,47 thousand €

Loan funding

0 €

Start date

29.03.2023

Expected end date

29.03.2023

Dimension

Climate Transition

Component

REPowerEU

Investment

Reinforced measure: Decarbonization of industry

Operation code

03/C21-i01/2022.P3738

Summary

O presente projeto tem como objetivo principal a instalação de um sistema de fotovoltaico com potência de 62,13 KWp, constituído por 114 painéis com potência unitária de 545W, reduzindo em 86,14% o consumo anual de energia.Foi feita uma análise pormenorizada aos consumos anuais de energia da fábrica, através das faturas de energia de 2021, que tiveram por base o estudo energético. Verificou-se que o consumo anual é de 121,98 MWh, e as emissões geradas de 33,003 tCO2, sendo possível diminuir significativamente esse consumo anual para 16,90MWh, sendo que, com a implementação do sistema alvo de investimento, a poupança de emissões em GEE é de cerca de 86,14%.O presente projeto pretende contribuir para a transição climática, alcançando a descarbonização do setor industrial, concretizando medidas do Plano Nacional de Energia e Clima 2030 (PNEC 2030), contribuindo para as metas de incorporação de energias renováveis e eficiência energética.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

42,47 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Tábua 42,47 thousand € ,