Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

+ Digital

Total project amount

3,01 thousand €

Amount paid

0 €

Non-refundable funding

3,01 thousand €

Loan funding

0 €

Start date

27.03.2025

Expected end date

31.12.2025

Dimension

Digital Transition

Component

Businesses 4.0

Investment

Businesses 4.0

Operation code

03/C16-i06-RAM/2024.P16692

Summary

Num mercado onde a precisão dos números e a agilidade na análise fazem a diferença, a DIÁLOGO DECIMAL consolida sua posição como referência em serviços de contabilidade, ao investir em tecnologia de ponta. A aquisição de equipamentos como os monitores HP Series 5 Pro e os Surface Laptop 6 reflete não apenas uma atualização de hardware, mas uma estratégia clara: oferecer aos clientes resultados ainda mais rápidos, precisos e confiáveis. A empresa pretende ter 2 monitores por posto de trabalho e aquisição de computadores portáteis para teletrabalho.Os novos monitores, garantem clareza visual para a análise detalhada de planilhas e relatórios, enquanto os laptops, equipados com processadores Intel Core Ultra 7, permitem o processamento ágil de grandes volumes de dados. Este investimento de €6.129,50 (incluindo IVA) é um testemunho do compromisso da DIÁLOGO DECIMAL com a qualidade e a inovação.Mais do que números, esta aquisição representa a busca contínua por excelência. Ao integrar tecnologia avançada ao seu dia a dia, a DIÁLOGO DECIMAL reforça a sua missão de transformar dados complexos em informações estratégicas, sempre com a segurança e a competência que seus clientes já conhecem. Num setor onde cada detalhe conta, a empresa prova que está um passo à frente, preparada para os desafios do futuro.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

60,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

3,01 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Funchal 3,01 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading