Information portal on various topics of management of public resources of the Portuguese State

PRR Project

Aumento das instalações fotovoltaicas existentes e da capacidade de armazenamento de energia através de sistemas de bate

Project sheet

Name

Aumento das instalações fotovoltaicas existentes e da capacidade de armazenamento de energia através de sistemas de bate

Total project amount

127,44 thousand €

Amount paid

121,07 thousand €

Non-refundable funding

127,44 thousand €

Loan funding

0 €

Start date

01.04.2023

Expected end date

01.04.2024

Dimension

Climate Transition

Component

Decarbonising Industry

Investment

Decarbonising Industry

Operation code

03/C11-i01/2022.P4929

Summary

A João R. Matos, S. A, de forma a contribuir para transição para uma economia neutra em carbono e circular, pretende aumentar as suas instalações fotovoltaicas numa capacidade total de 72,52 kW.p, correspondente a 148 módulos fotovoltaicos e proceder à instalação de dois conjuntos contendo um total de 51 baterias com uma capacidade de 167,96 kWh. Esta instalação ocupará uma área de 344,7 m² num telhado existente, com uma estrutura tipo rail.Com este projeto, o objetivo é incorporar fontes de energia renováveis e armazenamento de energia tornando-se mais sustentável, rentável e resiliente. De facto, a João R. Matos, S. A, com mais de sete décadas dedicadas à soldadura, é a única fabricante em Portugal de máquinas de soldadura e corte a plasma. Especificamente, a empresa desenvolve, produz e comercializa MMA (electrodo revestido), TIG, MIG/MAG, máquinas de soldadura por pontos, acessórios e consumíveis para soldadura e corte, possuindo uma vasta importância no panorama nacional.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,6
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

127,44 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 95 %,

Where was the money spent

By county

1 county financed .

  • Aveiro 127,44 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading