PRR Project
Projeto para a instalação solar fotovoltaica - FIRMAGO - FUNDIÇÃO DE ALUMÍNIOS SA
Project sheet
Name
Projeto para a instalação solar fotovoltaica - FIRMAGO - FUNDIÇÃO DE ALUMÍNIOS SATotal project amount
297,5 thousand €Amount paid
297,5 thousand €Non-refundable funding
297,5 thousand €Loan funding
0 €Start date
08.03.2024Expected end date
25.06.2024Dimension
Climate TransitionComponent
Decarbonising IndustryInvestment
Decarbonising IndustryOperation code
03/C11-i01/2022.P4855Summary
Com a presente candidatura, a FIRMAGO ? FUNDIÇÃO DE ALUMÍNIOS S.A, doravante designada por FIRMAGO, pretende instalar sistemas de produção de energia elétrica a partir de fonte de energia renovável para autoconsumo e, assim, contribuir para o objetivo da neutralidade carbónica ao promover a transição energética por incorporação de energia de fonte renovável. Neste sentido, propõe-se colocar painéis solares fotovoltaicos que promovam o aumento da auto-suficiência energética e a otimização dos consumos. No período de referência, a empresa apresenta emissões de gases de efeito de estufa (GEE) na ordem dos 354,83 tCO2 eq./MWh e consumos totais na ordem dos 1 928,39 MWh.Com este investimento, a empresa conseguirá uma redução anual na emissão de GEE e de consumo na ordem dos 30,94%, comparativamente ao período de referência (2021), maximizando, assim, a eficiência do consumo energético enquanto reduz a pegada de carbono.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
297,5 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 100 %,Where was the money spent
By county
1 county financed .
-
Braga 297,5 thousand € ,