Project sheet

Name

Higher Power - More Efficiency - Less GG (greenhouse gases)

Total project amount

105,8 thousand €

Amount paid

105,8 thousand €

Non-refundable funding

105,8 thousand €

Loan funding

0 €

Start date

03.04.2023

Expected end date

31.10.2023

Dimension

Climate Transition

Component

Decarbonising Industry

Investment

Decarbonising Industry

Operation code

03/C11-i01/2022.P4623

Summary

Pretende-se com o projeto:. aumentar o consumo de energia elétrica proveniente de fontes renováveis. aumentar a eficiência energética. diminuir as emissões de GEESerá aumentada a instalação fotovoltaica existente e realizada a otimização da produção de frio industrial, o que levarão à diminuição das emissões GEE. A diminuição de GEE resultará das i) emissões indiretas evitadas pelo aumento do autoconsumo e dos ganhos de eficiência energética da otimização da produção de frio, menor consumo da rede; ii) emissões diretas resultantes da alteração do fluido refrigerante e da eliminação de fugas nesse circuito, cujo fluido anterior tem elevado GWPComo resultados teremos:- redução em mais de 35% nas emissões de GEE- 11,58 % de economia de energia elétrica, Face à atual situação da empresa e do setor é uma intervenção inovadora, com uma atuação direta nas fontes energéticas, nos equipamentos de consumo significativo,contribuindo para a descarbonização e diminuição da pegada carbónica

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

105,8 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Oliveira de Azeméis 105,8 thousand € ,
Source EMRP