PRR Project
ARCAR Melhoria da Eficiência Energética
Project sheet
Name
ARCAR Melhoria da Eficiência EnergéticaTotal project amount
173,6 thousand €Amount paid
173,52 thousand €Non-refundable funding
173,6 thousand €Loan funding
0 €Start date
01.04.2023Expected end date
15.12.2023Dimension
Climate TransitionComponent
Decarbonising IndustryInvestment
Decarbonising IndustryOperation code
03/C11-i01/2022.P4458Summary
A redução dos consumos energéticos e das emissões de CO2 evitando-se desperdícios e possibilitando formas de poupança de energia com uma motorização mais eficiente dos equipamentos antigos e de elevado consumo energético, substituindo-os por máquinas e equipamentos de tecnologia recente e com motores de alta eficiência (IE3), face ao volume de produção da empresa, que se traduzirão num aumento da eficiência energética com redução de consumos, custos e também das emissões de CO2.Será ainda feita, a substituição da iluminação existente por tecnologia LED, mais eficiente e de menor consumo energético, permitindo, assim a diminuição de emissões GEE.Além disto, será implementado um sistema de gestão e monitorização de energia que permitirá controlar os consumos de energia nos equipamentos, identificar desvios de consumo, realizar correções imediatas e estabelecer metas para reduzir os consumos de energia no processo produtivo.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
173,6 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 100 %,Where was the money spent
By county
1 county financed .
-
Vila Nova de Gaia 173,6 thousand € ,