PRR Project
Descarbonização da UELD
Project sheet
Name
Descarbonização da UELDTotal project amount
187,58 thousand €Amount paid
187,58 thousand €Non-refundable funding
187,58 thousand €Loan funding
0 €Start date
01.06.2023Expected end date
31.12.2024Dimension
Climate TransitionComponent
Decarbonising IndustryInvestment
Decarbonising IndustryOperation code
03/C11-i01/2022.P4245Summary
O projeto designado ?Descarbonização da UELD? visa promover uma maior sustentabilidade e independência energética da empresa, tendo como linha orientadora a instalação de sistemas de produção de energia elétrica a partir de fonte de energia renovável para autoconsumo. A unidade recorre a tecnologia solar fotovoltaica, visando a fábrica da empresa, em Amarante. Intenciona-se uma redução no consumo energético 76,2 % (quando medido em MWh), e nas emissões de gases com efeito de estufa, 75,9 % (quando medido em tCO2), para o estabelecimento apoiado.Como empresa de metalomecânica, as suas atividades de fabrico, soldadura, decapagem, pintura e montagem terão uma melhor performance energética e maior sustentabilidade. Segundo estas diretrizes e orientação estratégica, as melhorias introduzidas tenderão a estabelecer uma diferenciação positiva comparativamente ao tipo de energia incorporada nos produtos e serviços disponibilizados pela concorrência no mercado.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
187,58 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 100 %,Where was the money spent
By county
1 county financed .
-
Amarante 187,58 thousand € ,