PRR Project
SICI93 - Otimização do Desempenho Energético das instalações produtivas
Project sheet
Name
SICI93 - Otimização do Desempenho Energético das instalações produtivasTotal project amount
200 thousand €Amount paid
200 thousand €Non-refundable funding
200 thousand €Loan funding
0 €Start date
01.03.2023Expected end date
31.12.2024Dimension
Climate TransitionComponent
Decarbonising IndustryInvestment
Decarbonising IndustryOperation code
03/C11-i01/2022.P4094Summary
Fundada em 1993, a SICI93 Braga ? Sociedade de Investimentos comerciais e industriais S.A. é uma empresa de confeção especializada no private label.A empresa possui 231 colaboradores com setores de corte, confeção e embalamento.O presente projeto engloba algumas das unidades da empresa SICI93, nomeadamente:? SICI Sede? SICI Marrancos? SICI VizelaA auditoria energética realizada às instalações da SICI93 teve como principal objetivo a determinação dos consumos de energia globais. A identificação de medidas de redução dos consumos elétricos e térmicos (MURE) foram também objetivo final da auditoria de forma a diminuir os consumos energéticos, aumentar a eficiência energética das instalações. Após a implementação das medidas previstas serão criadas as condições para a redução dos consumos totais de energia das várias unidades, representando uma diminuição de 46,35% do consumo total de energia atual, e uma diminuição das emissões de GEE, na ordem dos 48,18%
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
200 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 100 %,Where was the money spent
By county
1 county financed .
-
Vila Verde 200 thousand € ,