Total project amount

199,58 thousand €

Amount paid

99,99 thousand €

Non-refundable funding

199,58 thousand €

Loan funding

0 €

Start date

02.02.2023

Expected end date

01.02.2025

Dimension

Climate Transition

Component

Decarbonising Industry

Investment

Decarbonising Industry

Operation code

03/C11-i01/2022.P3792

Summary

A Celstone S.A. é uma empresa com cerca de 9 anos que se dedica à extração, transformação e comercialização de rochas ornamentais.Este projeto faz parte da estratégia de sustentabilidade energética da empresa, que vai permitir uma redução de 51% de emissões GEE e de 38% nos consumos de energia, da sua unidade industrial situada em Arrimal (Porto de Mós).O projeto prevê uma instalação fotovoltaica UPAC, que permitirá suprimir grande parte das necessidades de energia elétrica da empresa. Os investimentos contemplam também a substituição de empilhadores e da iluminação industrial, por equipamentos mais eficientes energeticamente. Serão também investidos sistemas digitais de medição e de monitorização de consumos energéticos e sistemas de otimização de motores. Será ainda adquirido um sistema de produção de oxigénio industrial para uso no processo, que permitirá abandonar o uso de botijas e, assim, eliminar o impacto indireto causado pelo transporte das mesmas.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,6
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

199,58 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50,1 %,

Where was the money spent

By county

1 county financed .

  • Porto de Mós 199,58 thousand € ,