Information portal on various topics of management of public resources of the Portuguese State

PRR Project

Descarbonização DCF Fábrica II por via da instalação de central fotovoltaica para autoconsumo, da substituição de empilh

Project sheet

Name

Descarbonização DCF Fábrica II por via da instalação de central fotovoltaica para autoconsumo, da substituição de empilh

Total project amount

200 thousand €

Amount paid

200 thousand €

Non-refundable funding

200 thousand €

Loan funding

0 €

Start date

01.02.2023

Expected end date

31.12.2023

Dimension

Climate Transition

Component

Decarbonising Industry

Investment

Decarbonising Industry

Operation code

03/C11-i01/2022.P3510

Summary

A Diamantino Coelho & Filho, S.A. (doravante designada como DCF) é uma SA, fundada em 1989, e que se dedica ao fabrico de alimentos compostos para animais, tendo sido pioneira em Portugal nesta atividade industrial. Atualmente, a DCF integra nos seus produtos uma elevada diversidade de gamas de rações de marca própria e adaptáveis aos diferentes sistemas de produção a jusante.É objetivo da DCF implementar soluções estratégicas de investimento que permitam atingir no futuro um razoável índice de descarbonização, nomeadamente, investir numa central fotovoltaica, na eletrificação do consumo de equipamentos de forma a eliminar progressivamente o consumo de gasóleo, na otimização energética de motores de equipamentos e na substituição de sistema de iluminação existente por leds de elevada eficiência energética. As soluções descritas, no seu conjunto, vão permitir a redução do consumo energético anual e as emissões de GEE num cômputo superior a 30%.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,6
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

200 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 100 %,

Where was the money spent

By county

1 county financed .

  • Tomar 200 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading