Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Emotion Defender | ActiveTrip AI – Assistente Inteligente de Turismo Ativo

Total project amount

174,07 thousand €

Amount paid

52,22 thousand €

Non-refundable funding

174,07 thousand €

Loan funding

0 €

Start date

01.01.2026

Expected end date

31.12.2027

Dimension

Resilience

Component

Investment and innovation

Investment

Inovação empresarial

Operation code

03/C05-i14.01/2025.P26942

Summary

O ActiveTrip AI representa a evolução da Emotion Defender rumo ao turismo ativo inteligente. Baseado em IA conversacional e análise preditiva de dados, o projeto cria roteiros adaptativos em tempo real, ajustados ao perfil do utilizador, condições meteorológicas e oferta local. A solução integra um Assistente Conversacional IA multicanal, um Motor de Recomendação Preditivo e uma Base de Dados Geoturística Dinâmica com trilhos, pontos de interesse e parceiros regionais. Inclui ainda integração com APIs de mapas, meteorologia e CRM, suportada por uma interface moderna e intuitiva.O projeto permitirá automatizar 70 % do planeamento, reduzir em 60 % o tempo de resposta e atingir 85 % de satisfação dos utilizadores, reforçando a digitalização do turismo e a competitividade da empresa, com dois novos postos de trabalho qualificados e aumento do Valor Acrescentado Bruto.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

174,07 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Bragança 174,07 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading