PRR Project

Upgrade técnico e tecnológico potenciador da fabricação de novos materiais / produtos e do processo produtivo

Project sheet

Name

Upgrade técnico e tecnológico potenciador da fabricação de novos materiais / produtos e do processo produtivo

Total project amount

229,5 thousand €

Amount paid

124,45 thousand €

Non-refundable funding

229,5 thousand €

Loan funding

0 €

Start date

01.06.2025

Expected end date

30.06.2026

Dimension

Digital Transition

Component

Businesses 4.0

Investment

Industry 4.0

Operation code

02/C16-i04/2025.P24353

Summary

Com a execução do presente projeto pretendemos promover um upgrade técnico e tecnológico, assente em conceitos e equipamentos core I4.0, que nos permitam inovar, quer em termos de produtos (produzir peças de pedra maciça) e o processo de fabrico (atualmente para se conseguir um produto semelhante, na realidade não era maciço, teríamos de recorrer a diversas operações, essencialmente manuais e que obrigavam a um processo de "colagem" dado só termos capacidade de produção de finas espessuras). Iremos assim promover uma transformação disruptiva em termos de processos e operações industriais pré-existentes, passando de um processo de baixa produtividade e capacidade produtiva, mecânico e manual (mão de obra intensiva), para conceitos intrinsecamente ligados à I4.0 como robótica, modelização industrial e transição digital de processos (produção e gestão), com ganhos enormes em termos de inovação, produtividade, robotização e interoperabilidade de sistemas, diversificação e rentabilidade.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

0,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

229,5 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 54,2 %,

Where was the money spent

By county

1 county financed .

  • Felgueiras 229,5 thousand € ,
Source EMRP