Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Q&S Green Carbon Less Water - Descarbonização na Unidade Industrial da QUINTA & SANTOS SCORE

Total project amount

800,69 thousand €

Amount paid

681,7 thousand €

Non-refundable funding

800,69 thousand €

Loan funding

0 €

Start date

01.01.2023

Expected end date

31.12.2023

Dimension

Climate Transition

Component

Decarbonising Industry

Investment

Decarbonising Industry

Operation code

02/C11-i01/2022.PC659095447-00471928

Summary

O projeto da Quinta & Santos Score ao Aviso nº 02/C11-i01/2022 ? Descarbonização da Indústria, do PRR ? Plano de Recuperação e Resiliência, inclui três medidas de descarbonização, que permitem reduzir as emissões de GEE em cerca de 33% em relação ao ano de referência inicial considerado (2019).#1. Tratamento de efluentes industriais, em ETARI dedicada, com unidade de reutilização de água (sistema de ultrafiltração#2. Eficiência energética ao nível de isolamento térmico (intervenção em cobertura e fachadas, num total de 2 884 m2) e sistemas AVAC (num total de 854 m2);#3 - Produção de energia renovável para autoconsumo, nomeadamente a instalação de um sistema fotovoltaico com uma potência de 403 kWp;

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,7
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

800,69 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 85,1 %,

Where was the money spent

By county

1 county financed .

  • Barcelos 800,69 thousand € ,
Source EMRP
24.11.2026