PRR Project
Biomass@FTC - Descarbonização da unidade fabril da FTC através da substituição de gás natural por biomassa renovável
Project sheet
Name
Biomass@FTC - Descarbonização da unidade fabril da FTC através da substituição de gás natural por biomassa renovávelTotal project amount
547,17 thousand €Amount paid
519,81 thousand €Non-refundable funding
547,17 thousand €Loan funding
0 €Start date
01.08.2022Expected end date
31.07.2024Dimension
Climate TransitionComponent
Decarbonising IndustryInvestment
Decarbonising IndustryOperation code
02/C11-i01/2022.PC658311467-00471726Summary
O presente projeto visa a descarbonização do processo produtivo da FTC, como resultado da introdução de uma tecnologia de produção de vapor mais sustentável e eficiente (enquadrada no domínio de intervenção 024ter), nomeadamente uma caldeira a biomassa, a qual, para além de permitir a utilização de resíduos têxteis como combustível, permitirá, também, reduzir a dependência da Empresa de fontes externas para a produção de utilidades quentes. A este nível, o projeto preconiza a utilização de um resíduo resultante da árvore de palma (PKS) e briquetes de algodão resultantes da compactação de cotão gerado no âmbito da atividade industrial da FTC, promovendo, deste modo, a circularidade de materiais intramuros. Assim, através do presente projeto, a FTC estima uma redução das emissões diretas e indiretas de GEE equivalente a 65% face ao ano de 2020, o que se consubstanciará numa redução de 3.104,67 ton CO2e, e uma redução do consumo energético de 113,82 tep.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
547,17 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 95 %,Where was the money spent
By county
1 county financed .
-
Guimarães 547,17 thousand € ,