PRR Project
Solução tecnológica integrada de produção energética renovável e armazenamento de energia.
Project sheet
Name
Solução tecnológica integrada de produção energética renovável e armazenamento de energia.Total project amount
821,4 thousand €Amount paid
780,33 thousand €Non-refundable funding
821,4 thousand €Loan funding
0 €Start date
01.11.2022Expected end date
31.10.2024Dimension
Climate TransitionComponent
Decarbonising IndustryInvestment
Decarbonising IndustryOperation code
02/C11-i01/2022.PC654746652-00471094Summary
O projecto da Godilac prevê um investimento numa solução tecnológica integrada de produção energética renovável através de produção fotovoltaica e de armazenamento de energia eléctrica baseada na tecnologia IFB (baterias de fluxo de ferro da ESS Inc), que disponibilizarão energia armazenada no instante em que o consumo energético seja superior à produção energética fotovoltaica.Prevê também investir em sistemas digitais de apoio, medição, monitorização, tratamento de dados para a gestão e optimização de processos, distribuição eficiente de energia consoante especificações técnicas e necessidades da empresa, reduzindo desperdícios e emissões poluentes, como o Sistema SCADA e EMS (Energy Management System).
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
821,4 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 95 %,Where was the money spent
By county
1 county financed .
-
Santo Tirso 821,4 thousand € ,