Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

METALHUB - Unidade Contentorizada Integrada para Reparação e Fabrico em Campo

Total project amount

596,23 thousand €

Amount paid

178,87 thousand €

Non-refundable funding

596,23 thousand €

Loan funding

0 €

Start date

01.01.2026

Expected end date

31.12.2027

Dimension

Resilience

Component

Investment and innovation

Investment

Inovação empresarial

Operation code

02/C05-i14.01/2025.P28266

Summary

O projeto METALHUB tem como objetivo desenvolver um sistema contentorizado transportável para fabrico e reparação de componentes metálicos em ambientes expedicionários — como bordo de navios, portos ou zonas de emergência — visando ampliar a resiliência das operações industriais fora de instalações convencionais. Este sistema integrará tecnologias híbridas avançadas de fabrico aditivo, nomeadamente Direct Energy Deposition (DED), Cold Metal Transfer (CMT), Cold Spray Additive Manufacturing (CSAM), além de fresagem CNC, permitindo a fabricação e reparação de peças de alta complexidade e dimensões variadas. Os desenvolvimentos serão validados em ambiente relevante, promovendo a qualificação tecnológica e a preparação para a transferência industrial.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

596,23 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Leiria 596,23 thousand € ,
Source EMRP
05.06.2026
All themes