Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Implementação de um sistema integrado de controlo de produção FLOW M-MES

Total project amount

173,88 thousand €

Amount paid

62,4 thousand €

Non-refundable funding

173,88 thousand €

Loan funding

0 €

Start date

23.07.2024

Expected end date

19.12.2025

Dimension

Digital Transition

Component

Businesses 4.0

Investment

Industry 4.0

Operation code

01/C16-i04/2023.P10059

Summary

A Fabrica das Queijadas da Casa do Preto sediada em Sintra com 93 anos de existência na sequência da construção de uma fábrica inovadora na Terrugem a empresa pretende adquirir sistemas inovadores integrados para controlar a variação do custo de fabrico ao longo da cadeia produtiva. Foram contemplados os serviços de implementação, subscrição (SAAS) da tecnologia e hardware chão de fábrica. O sistema integrado a adquirir contempla ainda uma câmara de frio com olho robótico e sensores. O sensor possui um transdutor cerâmico que vibra quando a energia elétrica é aplicada a ele. As vibrações comprimem e expandem moléculas de ar em ondas desde a face do sensor até um objeto alvo. Um transdutor transmite e recebe som. O sensor ultrassônico medirá a distância emitindo uma onda de som e depois "ouvindo" por um período de tempo definido, permitindo o eco de retorno da onda sonora que volta do alvo antes de retransmitir. Marca Frilux

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

0,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

173,88 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 35,9 %,

Where was the money spent

By county

1 county financed .

  • Sintra 173,88 thousand € ,
Source EMRP
24.11.2026
All themes
Transparency without leading